1. Short-Run Static Control Integration
Connects nozzle ionizers to local power supplies in compact automated cells where excess cabling would obstruct machinery.
Problem Solved
Eliminates the safety hazard and clutter of coiling excess standard 3-meter cables in tight enclosures.
cable managementspatial optimizationinterference reduction
2. Cleanroom Ionization Wiring
Provides power and signal paths for ionizers situated on wafer transfer robots or sensitive electronics assembly stations.
Problem Solved
Maintains signal integrity over short distances while adhering to cleanroom layout requirements.
signal integritycleanroom compliance24 VDC routing
3. Modular Conveyor Installation
Integrates static elimination heads into modular conveyor sections requiring discrete, short-length power connections.
Problem Solved
Facilitates modular machine assembly and disassembly without managing long cable loops.
modular assemblydiscrete wiringI/O transmission